Skip to main content
Website Project Process: 8 Steps From First Call to Launch
Web Development•

Website Project Process: 8 Steps From First Call to Launch

Craft Web Team
10 นาที
0 Views
Share:

A website project with an agency runs through eight main steps: a first call, the quotation, information gathering and site structure, visual design, design revisions, development, testing, and launch. The whole project usually takes 30 to 90 days, depending on the number of pages and how complex the system is. Whether it finishes on time depends on the client as much as on the agency, because almost every step needs something delivered or decided by the business owner.

This guide walks through the process the way Craft Web actually runs it, and spells out what the client does at each step. Use it to plan before you start, or to compare against proposals you are already reviewing.

What are the steps in a website project?

Here is the overview first. Each step is explained in the sections below.

StepWhat the agency doesWhat the client does
1. First callAsks about goals, customers and required featuresExplains the business, goals, budget and target launch date
2. QuotationWrites up scope, price, milestones and delivery datesChecks the scope carefully before approving
3. Information and structurePlans the page map and user flowSends information, logo, photos and answers
4. Visual designDesigns real screens for mobile and desktopReviews and consolidates feedback into one set
5. Design revisionsUpdates the design from written requestsSends clear change requests, then approves
6. DevelopmentBuilds the site, the admin panel and the SEO structurePrepares all final content
7. Testing and sign-offFixes issues found in testingUses the site for real and checks every page
8. Launch and afterPuts the site live and hands over the admin panelPrepares the domain and tries editing content

Step 1: What should you cover in the first call?

The first call is there so both sides agree on what the website is for, not just to ask for a price. The key questions are: what should visitors do on the site (call, message on LINE, request a quote, book, or buy), who your main customers are, whether they come on mobile or desktop, and whether there is a date the site must be ready by.

Craft Web offers a free consultation call. You do not need full documents at this stage, but a rough brief makes the call far more productive. See what to prepare in our website brief checklist.

What the client does: explain the business and the goal, give an honest budget range, share a few websites you like, and say when you want to launch.

Step 2: What should a website quotation include?

After the call, the agency turns the conversation into a quotation. At Craft Web, price and scope are made clear in the quotation, and if work has to be added along the way, the price is confirmed with you first, every time.

A good quotation answers these questions:

  • How many pages, and which ones
  • Which features, such as a blog, contact form, booking system or shopping cart
  • How many design revisions are included, and what extra rounds cost
  • How many milestones, and what is delivered on which date
  • What is not included, such as domain and server fees

Package ranges are on our pricing page. Prices start at 30,000 THB for a 1 to 2 page landing page, and the final price is always set in the quotation before work begins.

What the client does: read the scope line by line. If a page or feature you expect is missing, raise it now. Adding work after the project starts affects both price and timeline.

How are website payments split into milestones?

Craft Web splits each project into milestones, and every milestone has a delivery date attached. You see progress at regular points instead of waiting to see everything at the end. The milestone details are part of the quotation you approve.

Whoever you hire, the principle is the same: each milestone should be tied to something you can check, such as an approved site map, approved screen designs, or a working test site. If payments are tied only to calendar dates with nothing delivered, you have no way to tell how far the work has really progressed.

Step 3: What are site structure and wireframes?

Before anything is designed visually, you need to know which pages the site has, what each page says and in what order, and how a visitor moves from one page to the next. This is UX work: designing the flow so users can do what they came for quickly and easily.

How deep this step goes depends on the size of the project.

PackagePriceStructure work included
Starter30,000 THBDesign of 1 to 2 pages, suited to a landing page
Business45,000 to 60,000 THBCustom design for a 4 to 6 page site
Professional80,000 to 120,000 THBUX flow and wireframes, UI for 6 to 10 pages
Enterprise150,000 to 300,000+ THBUX research, UI for 10+ pages

A wireframe is a draft layout with no colours or real photos, showing only which blocks of information sit where on each page. Agreeing at this level makes changes fast, because no visual detail has been built yet.

What the client does: send business information, your logo, product or project photos, and answer the questions the team sends. If you have questions customers ask all the time, such as prices, terms or how to order, include them. That material often becomes the most important content on the site.

Step 4: How long does website design take?

At Craft Web the UX/UI design phase takes 14 to 90 days, depending on the package. A landing page takes far less time than a site with a dozen pages that needs UX research first.

This step is UI design: the screens people see and tap. The team designs real screens with colours, type, images and buttons for both mobile and desktop. A good site needs both UX and UI. A beautiful page where nobody can find the button will not close a sale. More on this on our UX/UI design service page.

What the client does: review the design with your customers in mind, not only your personal taste. Ask yourself whether a customer opening this page on a phone would know what to tap next. Then gather everyone's comments in your company into a single set before sending them back.

Step 5: How many design revisions do you get?

Craft Web includes up to 2 free rounds of website and UX/UI design revisions per project, covering changes to graphics, structure and basic design elements. How a round is counted depends on the size of the change.

Type of changeExampleCounts as
MajorNew core concept, redesign2 rounds
GeneralLayout or structure changes1 round
MinorTypos, small size tweaksNot counted

After the 2 free rounds, each further round costs 4,000 to 20,000 THB (excluding VAT), and each round can include up to 5 changes.

Change requests must be sent in writing by email or through the project management system, stating clearly what to change and where, with reference images if you have them. This protects both sides, since requests made over the phone are easily lost or misunderstood.

What the client does: name the person who approves the design from day one. The most common reason revisions spiral is a new person seeing the design late and asking to change things that were already approved, which usually counts as a major revision.

Step 6: What does the client do during development?

Once the design is approved, the team builds the site and its admin panel. Craft Web designs and develops with one team, so you do not hire a designer and a developer separately or coordinate between two teams yourself. Every site comes with a Thai-language admin panel where you can edit text, images, prices and articles yourself.

SEO is built in at this stage through page structure, speed and the data that helps Google understand the site. It is not left until after launch.

If the site connects to other systems, such as a CRM, accounting software or a payment gateway, this phase takes longer because data flowing between systems has to be tested.

What the client does: prepare all final content: text for every page, photos, product lists and prices. Late content is one of the top reasons a site misses its launch date even when the build is finished. If related accounts exist, such as the domain, hosting, LINE Official Account or payment gateway, have the access details ready.

Step 7: What should you check before signing off a website?

Before launch, use the site the way your own customers will. Check the following:

  • Open every page on your own phone, on both iPhone and Android if you can
  • Read every page and check the company name, phone number, prices and terms
  • Submit the contact form and confirm the message reaches the right inbox
  • Tap the call and LINE buttons to confirm the links work
  • If there is a shop, place a test order through to payment
  • Log into the admin panel, change one line of text, and check the page updates

Collect everything you find into a single list and send it once. That is much faster than sending items one by one all day.

Step 8: What happens at and after launch?

On launch day the domain is pointed to the new site. If you are moving from an existing site, such as an old WordPress site, Craft Web migrates your articles, pages and images and sets up redirects from the old URLs so the Google rankings you have built up are not lost. Read more in how to migrate a website without losing Google rankings.

The Business package includes admin panel training, so the site owner can edit text, images and articles from day one.

Launch is not the end. A website needs backups, security updates and uptime monitoring. Craft Web's monthly website care starts at 3,000 THB per month and includes weekly backups, system and security updates, and 24-hour downtime monitoring. Care contracts run for 1 year, and server and domain renewal fees are billed separately at the actual provider's rates.

What the client does: keep every password and account access somewhere safe, assign someone in the company to update content, and decide who will look after the site going forward.

How long does a website take, and what slows it down?

A full project takes 30 to 90 days. The three main variables are the number of pages, the systems that need to be connected, and how quickly the client sends material and makes decisions. For online stores, the number of products, payment channels and shipping integrations also matter.

What delays projects most often is rarely technical:

  • Content and photos arrive late or incomplete
  • Waiting on feedback from several people whose comments conflict
  • Scope changes mid-project, such as adding a booking system after the design is approved
  • The approver is unavailable when decisions are needed

If there is a fixed launch date, such as a product launch or an event, say so on day one. The milestones can then be planned backwards from that date, and you will know what your side needs to deliver by when.

Frequently asked questions

How long does it take to build a website with Craft Web?

About 30 to 90 days from the start of design until the site is live, depending on the number of pages and the systems to connect. The UX/UI design phase alone takes 14 to 90 days depending on the package.

How many design revisions are included?

Two free rounds per project. After that, each round costs 4,000 to 20,000 THB (excluding VAT) and can include up to 5 changes. Typo fixes and small size tweaks are not counted.

Can I add pages or features during the project?

Yes. The price and the effect on the delivery date are confirmed with you first, every time, so you can decide whether to add it now or after launch.

Can I edit the content myself after launch?

Yes. Every site has a Thai-language admin panel where you can edit text, images, prices and articles without waiting for the developers.

If you are planning a website and want a realistic timeline for your project, book a free call with Craft Web. We will help you pin down the scope and what to prepare at each step.

Share this article

Share:
Ready to Transform Your Digital Presence?
Crafting websites that drive your business forward
Certification
DBD Registered - Department of Business Development Thailand
Registration No:
0105566055663
© 2026 Craft Web. All rights reserved.